Level 3TM Overview |
|
 |
|
Modern data centre facility situated in Amsterdam Southeast |
 |
|
Operational since June 1999 |
 |
|
Technical space arranged over two floors |
 |
|
Total size (technical space): 10,073 m2 |
 |
|
Available fully fitted space: 4,000 m2 |
 |
|
Maximum site power: 5 MVA |
 |
|
Carrier connectivity: Level 3TM, Colt, Carrier One, Versatel, KPN, |
|
|
BTIgnite, Eurofiber, WorldCom, UPC |
|
Technical Summary |
|
Main Power |
|
 |
|
Duel redundant 5MVA, HV dedicated underground cable feeds to 2 x |
|
|
dedicated redundant 2.5MVA transofrmer substations |
|
Generators |
|
 |
|
Two (three ultimate) x 1.5MVA diesel-driven emergency power |
|
|
generators on different power distribution systems giving 3MVA |
 |
|
(4.5MVA ultimate) |
 |
|
Automatic start in less than one minute to feed 100% of the facility |
 |
|
Generators tested quarterly |
 |
|
Fuel storage for 24-hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
|
UPS |
|
 |
|
Two separate systems - two x 625kVA and two (five ultimate) x |
|
|
625kVA Hybrid Rotary UPS modules providing 2500kVA (4375kVA |
|
|
ultimate) total output with N+1 redundancy |
 |
|
15-minute battery autonomy per UPS module |
 |
|
Underfloor power track distribution system |
|
DC |
|
 |
|
8000 amps 48VDC power system for Telecom Network Equipment |
 |
|
Single bus systems with dual-redundant A & B distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
|
Environment |
|
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C ± 2°C |
 |
|
Humidity regulated overall to 50%RH ± 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
|
Physical |
|
 |
|
Minimum floor-to-ceiling clearance: 2,975mm from top of raised floor |
 |
|
750mm raised floor height (depending on floor) |
 |
|
Raised Floor Loading: 14kN/m2 |
 |
|
Structural Floor Slab: 25kN/m2 on ground floor, 3kN/m2 on first floor |
|
Fire Strategy |
|
 |
|
Use of non-inflammable and low-smoke zero halogen materials where |
|
|
possible |
 |
|
No storage (especially of flammable materials) within technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Early warning detection via Very Early Smoke Detection Alarm |
|
|
(VESDA) |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
|
Security |
|
 |
|
Full electronic access control system, based on Proximity cards and |
|
|
PIN keypad. Biometric Palm-scanners for colocation areas. |
 |
|
Intruder detection system on escape and riser doors |
|
Closed Circuit Television (CCTV) |
|
 |
|
CCTV monitoring and recording of all access points and circulation |
|
|
areas |
|
Building Monitoring System (BMS) |
|
 |
|
Location Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
|
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity |
|
|
conditions and alarms |
 |
|
Full perimeter under-floor leak detection linked to building monitoring |
|
|
system |
|
Telecom Infrastructure |
|
 |
|
Facility is designed to accommodate standard rack/cabinets of |
|
|
2,200mm nominal height |
 |
|
Power and copper cabling normally distributed under floor; fibre |
|
|
cabling distributed overhead within a managed containment system |
 |
|
Fibre entry to the building is via four independent points |
|
General Facilities |
|
 |
|
Dedicated loading area (40m2) |
 |
|
Three customer test rooms (10m2 each) and storage area (50m2) |
 |
|
Goods lift (maximum load of 2,500kg), 1.4m wide x 2.4m high |
 |
|
While not a standard offering, the roof space is capable of housing |
|
|
antennae equipment |
|