Level 3TM Overview |
|
 |
|
Modern data centre facility situated close to Mainzer Landstrasse in the |
|
|
West of Frankfurt |
 |
|
Operational since June 1999 |
 |
|
Technical space arranged over 1 floor |
 |
|
Total size (technical space): 4,333 m2 |
 |
|
Available fully fitted space: 1,114 m2 |
 |
|
Maximum site power: 4 MVA |
 |
|
Carrier connectivity: Level 3TM, COLT, DTag, WorldCom |
|
Technical Summary |
|
Mains Power |
|
 |
|
4MVA supply via dedicated dual redundant underground 10kV cable |
|
|
feeds to dedicated 2 x 2 MVA 10kV/400V transformer substation |
|
Generators |
|
 |
|
One (two ultimate) x 2 MVA diesel driven emergency power |
|
|
generators giving 2 MVA (4 MVA ultimate) |
 |
|
Automatic start in less than one minute to feed 100% of the facility |
 |
|
Generators tested monthly |
 |
|
Fuel storage (Diesel) for 24-hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
|
UPS |
|
 |
|
Two (three ultimate) x 625 kVA Hybrid Rotary UPS modules providing |
|
|
625 kVA (1,250 kVA ultimate) total output with N+1 redundancy |
 |
|
15-minute battery autonomy per UPS module |
 |
|
Dual redundant A and B distribution strategy |
 |
|
Underfloor power track distribution system |
|
DC |
|
 |
|
48VDC power system. 4860A expandable to 6500A |
 |
|
Single bus system with dual redundant "A" and "B" distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
|
Environment |
|
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C ± 2°C |
 |
|
Humidity regulated overall to 50%RH ± 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
|
Physical |
|
 |
|
Minimum floor-to-ceiling height: 2,980mm from top of raised floor |
 |
|
750mm raised floor height |
 |
|
Raised Floor Loading: 14kN/m2 |
 |
|
Structural Floor Slab: 10 kN/m2 |
|
Fire Strategy |
|
 |
|
Use of non-inflammable and low-smoke zero halogen materials where |
|
|
possible |
 |
|
No storage (especially of flammable materials) within technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Very Intelligent Early Warning (V.I.E.W.) detection above and below |
|
|
raised floor |
 |
|
Smoke extract system activated by fire alarm |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
|
Security |
|
 |
|
Remote 24 x 7 security monitoring |
 |
|
Full electronic access control system, based on proximity cards with |
|
|
photo and PIN keypads |
 |
|
Biometric Palm-scanners in addition for Colocation areas |
 |
|
Locks on colocation suites and cabinets |
 |
|
Intruder-detection system on all doors and windows |
|
Closed Circuit Television (CCTV) |
|
 |
|
CCTV monitoring and recording of all access points and circulation |
|
|
areas |
|
Building Monitoring System (BMS) |
|
 |
|
Local Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
|
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity |
|
|
conditions and alarms |
 |
|
Full perimeter under-floor leak detection linked to building monitoring |
|
|
system |
|
Telecom Infrastructure |
|
 |
|
Facility is designed to accommodate standard rack/cabinets of |
|
|
2,200mm nominal height |
 |
|
Power is normally distributed under floor; fibre and copper cabling |
|
|
distributed overhead (fibre within a managed containment system, |
|
|
copper within a heavy-duty ladder rack system) |
 |
|
Fibre entry to the building is via four independent points |
|
General Facilities |
|
 |
|
Dedicated loading area - delivery hours 08.00 - 18.00 (Mon. to Fri.) |
|