Level(3)TM Overview |
|
 |
|
Modern data centre facility in the Nanterre district of Paris, to the |
|
|
West of the City Centre |
 |
|
Operational since June 1999 |
 |
|
Technical space arranged over 1 floor |
 |
|
Total size (technical space): 4,245 m2 |
 |
|
Available fully fitted space: 1,475 m2 |
 |
|
Maximum site power: 8 MVA |
 |
|
Carrier connectivity: Level 3TM, France Telecom, Colt, Cegetel, |
|
|
Telecom Development, Interoute, Telia, Net/Tiscali, MFN, Completel, |
|
|
UPC, WorldCom |
|
Level(3)TM Technical Summary |
|
Mains Power |
|
 |
|
8MVA supply via dedicated quad-redundant underground 20kV cable |
|
|
feeds to dedicated redundant 4 MVA 20kV/400V transformer |
|
|
substations |
|
Generators |
|
 |
|
Two x 1.2 MVA diesel-driven emergency power generators giving |
|
|
2.4 MVA |
 |
|
Automatic start in less than one minute to feed 100% of the facility |
 |
|
Generators tested monthly |
 |
|
Fuel storage (Diesel) for 24-hour continuous operation at 100% load |
 |
|
24 x 7 agreement with local fuel supplier |
|
UPS |
|
 |
|
Three x 420 kVA Hybrid Rotary UPS modules providing 840kVA total |
|
|
output with N+1 redundancy |
 |
|
15-minute battery autonomy per UPS module |
 |
|
Underfloor power track distribution system |
|
DC |
|
 |
|
48VDC power system (4500A expandable to 6000A |
 |
|
Single bus system with dual-redundant "A" and "B" distribution |
 |
|
Four hours of battery autonomy |
 |
|
Underfloor direct A and B feeds from PDU to fuse panel |
|
Environment |
|
 |
|
750W/m2 average cooling capability over the gross space |
 |
|
Temperature regulated overall to 21°C ± 2°C |
 |
|
Humidity regulated overall to 50%RH ± 10% |
 |
|
Technical areas positively pressurized to minimize dust ingress |
|
Physical |
|
 |
|
Minimum floor-to-ceiling height: 4,117mm from top of raised floor |
 |
|
750mm raised floor height |
 |
|
Raised Floor Loading: 12kN/m2 |
 |
|
Structural Floor Slab: 2.5 kN/m2 |
|
Fire Strategy |
|
 |
|
Use of non-inflammable and low-smoke zero halogen materials where |
|
|
possible |
 |
|
No storage (especially of flammable materials) within technical space |
 |
|
Building split into sealed, independent, fire compartments |
 |
|
Very Intelligent Early Warning (V.I.E.W.) detection above and below |
|
|
raised floor |
 |
|
Smoke extract system activated by fire alarm |
 |
|
Double-interlocked pre-action dry pipe sprinkler system |
|
Security |
|
 |
|
Remote 24 x 7 security monitoring |
 |
|
Full electronic access control system, based on proximity cards with |
|
|
photo and PIN keypads |
 |
|
Biometric Palm-scanners in addition for Colocation areas |
 |
|
Locks on colocation suites and cabinets |
 |
|
Intruder-detection system on all doors and windows |
|
Closed Circuit Television (CCTV) |
|
 |
|
CCTV monitoring and recording of all access points and circulation |
|
|
areas |
|
Level(3)TM Building Monitoring System (BMS) |
|
 |
|
Local Operations and Control Centre |
 |
|
Network monitoring system with critical alarm repeating to Regional |
|
|
Management Centre |
 |
|
24 x 7 local monitoring and logging of temperature and humidity |
|
|
conditions and alarms |
 |
|
Full perimeter under-floor leak detection linked to building monitoring |
|
|
system |
|
Telecom Infrastructure |
|
 |
|
Facility is designed to accommodate standard rack/cabinets of |
|
|
2,200mm nominal height |
 |
|
Power is normally distributed under floor; fibre and copper cabling |
|
|
distributed overhead (fibre within a managed containment system, |
|
|
copper within a heavy-duty ladder rack system) |
 |
|
Fibre entry to the building is via two independent points |
|
General Facilities |
|
 |
|
Dedicated loading area - delivery hours 08.30 - 17.30 (Mon. to Fri.) |
 |
|
Customer test area (10 m2) and customer storage area (15 m2) |
 |
|
Goods lift - 1.8 m wide x 2.4 m high (maximum load 2,500 kg) |
|